The Loop to remain open during concrete pour - The Explorer: News

The Loop to remain open during concrete pour

Print
Font Size:
Default font size
Larger font size

Posted: Wednesday, May 7, 2014 4:00 am

Users of The Loop along Pantano Wash southeast of Michael Perry Park are asked to use caution during a concrete pour that was scheduled to begin on Tuesday, May 6.

The Loop will remain open, but pedestrians and bicyclists will need to be aware of concrete truck traffic on the path. The trucks will be escorted into and out of the site, warning users to move off to the shoulder or to a safe pull-out location during passing traffic.

Pima County Regional Flood Control District is repairing drainage in the area. The work is needed to protect the slope and subgrade sewer lines from off-site storm drainage and is expected to be completed by mid-May.

Please visit The Loop online for the latest maps and updates on access, improvements and other news about The Loop. Or check out – and “like” – The Loop on Facebook.

© 2014 The Explorer. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

More about

More about

Welcome to the discussion.

Kino College

Kino CollegeEnroll today: http://www.kinocollege.com/

Featured Videos

Spacer4px

Online poll

Loading…

Follow us on Facebook